Installation
Installing a bed exit sensor: what to check
A commissioning guide to validate the bed, connectivity, assignment and alerts before using monitoring in a care facility.
Prepare the bed and environment
Confirm sensor compatibility with the bed and mattress, positioning, power and cleaning requirements with the supplier. Follow the equipment instructions for placement; this guide does not replace the technical manual. Do not assume all surfaces or arrangements behave alike.
Connect and assign correctly
Verify connectivity in the room and link the device to the correct bed. Check that the label shown in alerts identifies the location clearly. If the sensor moves to another room, update its assignment before using it again.
Test detection and response
Run controlled occupancy and bed exit tests with the responsible team. Check that the expected event occurs and the on-call contact receives the alert. Also test a first contact who does not acknowledge, to verify escalation, and review how a disconnection is reported.
Hand the system over to the shift
Assign maintenance responsibility, a review routine and a procedure for service unavailability. Explain what acknowledgement means and how staff should continue care during an incident. Revalidate after changes to the bed, mattress, network or configuration. A Velora Connect demo can cover this journey before a deployment is agreed.
Take this to your team
- Validate compatibility and placement with the supplier.
- Assign the device to the correct bed.
- Verify delivery, acknowledgement and escalation.
- Agree incident procedures and routine checks.